12 X 16 Mid Levell Rev 3
Mid level for a proposed John Day Valley Railway layout. Helix in top left is 24" radius, 3.3%, 2 1/4 turns.
-
There are no comments to display.
Mid level for a proposed John Day Valley Railway layout. Helix in top left is 24" radius, 3.3%, 2 1/4 turns.