UP postpones 4014 tour!!!

BoxcabE50 Apr 22, 2022

  1. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,048
    653
  2. Kurt Moose

    Kurt Moose TrainBoard Member

    9,852
    14,306
    147
    Do'h!!

    :mad::eek::oops::cry:
     
    BNSF FAN likes this.
  3. BNSF FAN

    BNSF FAN TrainBoard Supporter

    10,008
    29,879
    153
    I got the email from the UP Steam Club about this. Guess business has to come first.
     
    Hardcoaler likes this.
  4. mmi16

    mmi16 TrainBoard Member

    736
    1,357
    40
    Confirmation of just how badly UP has screwed themselves.

    They think they know the price of everything while in reality they know the value of nothing.
     
    BoxcabE50 and Hytec like this.
  5. Hytec

    Hytec TrainBoard Member

    13,976
    6,938
    183
    Amen. Sadly this applies to most, if not all the Class 1's.
     
  6. acptulsa

    acptulsa TrainBoard Member

    3,363
    5,952
    75
    I don't know. They may have extra business to handle because BNSF is actively trying to divest themselves of train crews.
     
  7. mmi16

    mmi16 TrainBoard Member

    736
    1,357
    40
    To screw up requires UP.
     
    BoxcabE50 and Kisatchie like this.
  8. Kisatchie

    Kisatchie TrainBoard Member

    1,031
    1,322
    44
    Hmm... I wish I had
    thought of that...
    [​IMG]
     
    BoxcabE50 likes this.
  9. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,048
    653
    Something I have been wondering- Are those "Class 1" companies using PSR and mega length trains able to move the goods as swiftly as a couple of decades back? I have a feeling transit times may have slowed considerably, and that definitely would add to so-called "supply chain" issues.
     
  10. Hytec

    Hytec TrainBoard Member

    13,976
    6,938
    183
    Don't know if it's because of PSR, but lately NS between Meridian, MS and Atlanta has become a nightmare for AMTRAK schedule keeping. A friend was on the Crescent last week. He said they pulled into a siding to let two very long freights pass. They then backed out of the siding to proceed because there was a freight already in the siding. Apparently that freight was short enough to fit in the siding. They were over fours down into Baltimore due to freight delays.
     
  11. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,048
    653
    It keeps popping into my mind that such delays were supposedly not to happen, when the whole thing was initiated fifty one years ago. Yet here we are....
     
    Hytec likes this.
  12. mmi16

    mmi16 TrainBoard Member

    736
    1,357
    40
    Not that it is any excuse - but haven't we olde pharts been complaining for decades that the World is moving too fast?
     
    BoxcabE50 likes this.
  13. mmi16

    mmi16 TrainBoard Member

    736
    1,357
    40
    For a railroad to operate efficiently and effectively - the Operating Plan must take into consideration the physical and geographical constraints that exist in the territory where The Plan is to be operated. In addition to acknowledging the effects of grades upon territory, track configurations with both single and multiple track territories and more importantly the size and effectiveness of terminals and their abilities to originate and terminate properly configured trains in a timely manner. Operating trains between terminals in a few hours means very little when it take three or more hours to originate that train from a terminal and have it operate to the next terminal who holds the train out for hours because they can't originate 'their' train and thus create the space for the arriving train. Oversized trains created oversized delays to all trains on the systems where oversized trains are SOP.
     
    BoxcabE50 and Hytec like this.
  14. Hytec

    Hytec TrainBoard Member

    13,976
    6,938
    183
    Sad commentary where top management orders implementation without comment or knowledge of infrastructure. It will be many years, if not decades before infrastructure catches up with longer sidings, larger/longer yards, even double-tracking in areas deemed unnecessary by the financial wizards.
     
    wm-webb and Kurt Moose like this.

Share This Page