Turtle Creek Central Part 5

John Moore Oct 7, 2020

  1. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Well some big changes are in the works for the TCC. Previous versions of the TCC have had a sawmill so one is being added. The site is the former hardware and mercantile.

    The hardware, two houses, and some trees were removed.

    Since the site is small I needed a small sawmill and got one very cheap off Ebay. It is the Pola kit sold by Model Power.

    I made a paper cut out to place the sawmill and the tracks including two new bridges. And since space is an issue I ordered a #4 unitrack turnout to go in front of the brewery.

    Because this is a water powered sawmill I had to get the water to the mill so built a flow over dam for the stream and a flume to get the water to the mill raceway. I ordered some culverts to put part of the flume under ground. The control gate which routes the water into the flume.
    The flow over dam being constructed.


    I had to bring the mill raceway around to the other side of the sawmill.
     
  2. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    In addition to clearing the site for the sawmill I also cleared out the train station and the M of W complex. Ordered again finding on Ebay a N scale station by AHM, and a Kato passenger platform plus two Tichy Trains water columns and a long Kato bridge.

    Everything was test fitted and the mill location marked. The Kato bridge and its longer length were used to span the stream diagonally while the shorted Atlas bridge was modified for curved track.

    With the mill and the track positioned and marked I cut out the small log pond.

    At the same time I also scrapped the park by main street in favor of station parking and redid some of the grade crossings with GreenMax grade crossing kits.

    And because space is tight I created a Jillpoke for log unloading. And yes it swivels and it works.

    Spackled over the bare foam and installed one of four culverts, this one draining the pond. The culverts are Woodland Scenic's concrete.

    And the finished flume gates ready to install in the stream bank.
     
    sams, Kurt Moose and SP-Wolf like this.
  3. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Since the station had to be removed to make room for the turnout track going to the sawmill and replaced with a station with a narrower width I decided to go with all new passenger platforms.

    I cut down the platform ending with this.

    One of the completed platforms ready to install. Kato includes some neat little things with their platform kits. Small kiosks. and a sprue with speakers and sign boards and flood lights plus other things.

    The platform installed.

    The kiosk was converted into a doughnut, coffee, and sandwich shop.

    Meanwhile I went to work creating a way to get logs out of the pond and into the sawmill. Took some mine track and a very modified mine ore car and built an extension going into the pond.

    While things were drying and setting up I made a 2nd platform a bit shorter than the first and attached it to the station platform and installed the same.
    New #4 turnout leading to the sawmill track is behind the station.
     
    sams, SP-Wolf and NtheBasement like this.
  4. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Like all my ponds there has to be cattails somewhere and my favorite for reeds is horsehair. I was out of green dyed horsehair so I made my own using food coloring that gave me a bright green. For a duller green I already had some in the color and some yellow/brown for dead cattail reeds.
    For the drum beater seed heads I tried a new technique of using .04 mm rod.

    Meanwhile I created the log unload with with 5/64 inch dowels cut to 20 N scale feet long. My log flats are 34 N scale feet long and can handle a 30 N scale foot log. The logs sloping down into the pond are lined up to give me 45 feet wide.

    In the same photo on the left is the flow over dam and the diversion for the water flume to the mill. A common practice still in use today to raise a river level to feed canals. Every so often rocks have to be replaced in the flow over dam and that way is to use a cableway crossing the river.
    The cableway is still a work in progress and was made from scrapped catenary masts. The bucket is an ore car.
     
    sams and SP-Wolf like this.
  5. Massey

    Massey TrainBoard Member

    2,023
    6,559
    58
    Looks good. I love the detail you put into your layout.
     
    sams likes this.
  6. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Thank you. I have been incorporating mini scenes into my layouts for years now. The last sawmill pond I did I had a fisherman in the water having been butted there by a goat and a crew of the sawmill in a boat coming to his rescue. And another fisherman on the bank having just caught the big one. Wicked Wanda's on the water has a mini scene and the fish market also has a mini scene, in fact two of them. The Coast Guard buoy tender also has a scene on several decks.
     
    sams and Massey like this.
  7. Massey

    Massey TrainBoard Member

    2,023
    6,559
    58

    When I had my Lego city I had little scenes like that all over the place. I had a crook breaking into the bank through the skylight on the roof, and at the same time the armored truck driver left the door open on the truck (which another crook was taking advantage of) and he even had money falling off the cart he was pushing into the bank. A lady too caught up in her cell phone didn't realize that a cat had chased her toy dog across a rooftop. I was there with my portable HAM radio, and even a guy asking a gal to marry him. Things like that.
     
    sams likes this.
  8. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Well the cattails have been installed and now waiting for the glue to dry before trimming. There are ten patches of them.

    A couple of views of the station and the M of W complex now more compact with fewer buildings.

    Kato's doughnut and sandwich shop has just been installed. Waiting for delivery today I hope of some Arizona Mineral and Rock dark earth. Some of that is going in the pond in light patches to give a muddy bottom. When that sets up I will be installing vegetation in the pond.

    And 140 inches of 3rd rail is ready for installation as soon as I get the insulators ready.
     
  9. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Well the cattails are in and trimmed to 8-10 N scale feet high. They grow that high. The drumbeater seed heads were installed but one has to squint some to see them.

    And I have installed third rail between the station and the port yard lead which is as far as it will go on this end.

    Now I have to go back and trim up the insulators and get rid of the red marks that were used as the markers to install them.

    The rest of my supplies show out for delivery today so I can get back to scenic work on the sawmill.
     
    sams, BarstowRick and SP-Wolf like this.
  10. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Well three solid days of rain and a 99% humidity have played havoc with getting glue to set so had to turn on the AC and deploy the portable heater in the man cave. But I finally got the last of the vegetation in the sawmill pond.
    A mix of fine and clump grass and some small woodland ferns. This pond will get two or three pours of water up to about a half inch deep. The white showing is glue still drying.

    I also applied scenic material around the mill and office/hardware and the the small hill to the right of the office.


    Wanting to put some small evergreens around the mill and on the small hill I went looking for Z scale trees, Did not like what I saw in appearance, amount, or price so decided to make my own. Cut the tops out of a bunch of bottle brush trees so I had some ten to twenty foot trees. The trees that I cut the tops out of just need a pair of scissors to get back into shape again. I have a few plastic trunk trees I will leave as is.

    So tomorrow will be tree planting day.
     
    BarstowRick and SP-Wolf like this.
  11. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
  12. Massey

    Massey TrainBoard Member

    2,023
    6,559
    58
    sams and mtntrainman like this.
  13. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    The horizontal trees are delivered by rail. About a month from pouring water for the stream, flume, and pond. Hopefully by then the danged humidity will have dropped. That is the negative side to living in a maritime area. The plus side is great fishing, oystering and claming, and shrimping, and plus great seafood.

    More trees to plant this afternoon and third rail to install.
     
    Last edited: Oct 13, 2020
    sams and Massey like this.
  14. Massey

    Massey TrainBoard Member

    2,023
    6,559
    58

    Yes I have lived near the Puget Sound most of my life and when I was not there the Navy made sure I was close to water. I could live out of the ocean and be a happy man.
     
    sams likes this.
  15. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    sams and SP-Wolf like this.
  16. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,063
    27,724
    253
    I enjoyed seeing your sawmill come together. Very nice so far!
     
    sams likes this.
  17. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Thanks. The real fun was figuring out how to place the mill within the small space then redoing the water channel to the mill water wheel. Then the next challenge was how to get the water to it. I remembered the flow over dam on the Yellowstone at intake that is used to fill the Yellowstone Valley irrigation canals. The next issue I faced was how to not let the water flume take away limited space thus part of it is below ground.

    A lot of the issues would have been easy if the sawmill was on the right side of the stream but that would have involved tearing out the entire brewery complex.
     
    sams likes this.
  18. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Yesterday I got the lumber stacks, pilings, and poles placed on the sawmill grounds and added some more trees. Over by the cable tower I have one of my little Fordson tractors that I found at a train show years ago. I built a front bucket for it. On another one I have a rear mounted mowing deck.
    [ GALLERY=media, 139642]100_0739-1 by John Moore posted Oct 15, 2020 at 8:38 AM[/GALLERY]
     
    sams and Massey like this.
  19. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Well no work has been done now for 2 days. Some how the door came ajar during the night to the man cave and when I walked in the room in the morning I found one feline sleeping on the computer desk and another sleeping in the harbor. The harbor looks like a tsunami hit with vessels capsized. Crossing gates were either broken or damaged and there was some damage to the village notably the fire station hose drying tower knocked off and vehicles laying on their sides. The brewery looked untouched and the sawmill area was untouched.

    So I have already decided to replace the crossing gates with simple crossbucks and I found some on Ebay for cheap.
    https://www.ebay.com/itm/Tichy-Trai...rentrq:3cf58fa11750a9c5660d95f9fffbf478|iid:1
    So two sets of Tichy Trains crossbucks are on their way now and when they get in I will spend a day installing them and repairing the damage. Luckily my 32 pound Tiger Tabby did not get up on the layout or it would look like a tsunami plus a magnitude 8 earthquake.
     
    Last edited: Oct 18, 2020
    sams likes this.
  20. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,273
    183
    Well the Tichy Trains crossbucks arrived this evening in the post. So this weekend I can replace all the crossing arms with simple crossbucks.
    Unlike some N scale stuff I have seen these appear to be to scale. Now to figure out how high these are supposed to be.

    A quick Google check gives 9 foot to the center of the X on the crossbuck.
     
    Last edited: Oct 20, 2020

Share This Page