Italian HO scale modular layout - WIP

minesweeper Feb 27, 2018

  1. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    This week I was out of town and brought some modeling stuff, just put the rigging on the electrical cab, and got the latest touches today.
    Had to use the whole Preiser rigging kit, plus some kitbashing with 0,8 mm brass. IMG_6502.jpeg IMG_6503.jpeg

    Not yet finished, paint and the rest of pieces will go in this week or next weekend. :)
     
  2. traingeekboy

    traingeekboy TrainBoard Member

    5,677
    580
    82
    That looks great mine sweeper.
     
    gjslsffan likes this.
  3. gjslsffan

    gjslsffan Staff Member

    2,633
    5,759
    69
    Thats some great modeling there minesweeper.
     
  4. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    Thanks,
    I got an engineer friend of mine (the guy who builds, not the one driving trains) explain me how to do since I also ran out of parts.
    He told me it would pass in the 70s and 80s but later it was not going to be due to safety rules.

    Inviato dal mio BLN-L21 utilizzando Tapatalk
     
    traingeekboy likes this.
  5. RGW

    RGW TrainBoard Member

    2,033
    2,501
    65
    Nice work Maurizio.
     
  6. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    A few new pictures as I finished the cement mixer, and later wrapped it to protect from the rain and snow (the site is "closed" as I would not like the "open site" during night operations...., it may be in pause due to sub zero temperatures, by the way it is winter and we are 4000ft high).
    The site.... the fence is just placed there, I need to trim it.
    IMG_6622.jpeg

    The mixer, during work hours....
    IMG_6621.jpeg

    and during off work hours...
    IMG_6623.jpeg

    The mixer is fully scratchbuilt:
    the chassis is a scrap piece of puzzle
    the wheels came from a wiking Mercedes in the scrapyard
    the mixer cup is the cap of a lip balm
    the mixer crushers are pieces from a spring loaded gadget car
    the small wheels are part of the preiser rigging kit.

    Rust wash and some cement and rust textured paint to recreate the "dirtiness" of these machines.
     
    fordy744, traingeekboy, RGW and 2 others like this.
  7. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    Hi,
    just got some more work being done.
    I got the handrails for the underground passage and the platform between tracks 3 and 4, and used some spare Italian style "sandstone benches" (it is actually the white stone used by the ancient romans; these are simply made with cardboard) and one drinking water fountain to give some texture to the platforms.
    IMG_20200223_182314.jpg
     
  8. VinceP

    VinceP TrainBoard Member

    1,935
    2,036
    44
    Coming along very nicely Minesweeper
     
  9. traingeekboy

    traingeekboy TrainBoard Member

    5,677
    580
    82
    I'm curious if you will be able to manage any kind of mainline, or if you are building a station setting alone.

    I may have asked this before.
     
  10. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    The layout will be U shaped in the garage in my house in Rome.
    The station is designed to fit the width of the garage, with the fiddle yard on one side (mainline), and the branchline on the other. I have 7 meters on each side, but the one on the fiddle yard would be shorter due to 1 closet and the washbasin.
    The branchline will have some open line and another small station with a brewery, in the end it will all be a switching layout.
    I may decide to move the station on the same side of the fiddle yard to have a longer branchline, but being modular i am in no hurry to decide.
     
    traingeekboy likes this.
  11. Chops

    Chops TrainBoard Member

    506
    490
    17
    Wow, great content and form. Liking Italian model rail more with each development.
     
  12. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    6461.jpg
    Did actually take a break from layout construction and decide to upgrade some Italian 6 axle articulates to DCC (following a full revision).
     
  13. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    The four "girls" on parade.
    They are basically the same locomotive in different liveries except the brown one which has freight gear and lower top speed (120kph instead of 140), also the models have the same mechanics, the ones on the side have a slightly different appearance on the sides and roof as these reproduce the ones modified for push and pull service during the 70s and 80s.
    E646/645 class about 4MW continuous power, 112 tons weight. in service from the mid 60s to the late 2000.
    646.jpg
     
    fordy744, BoxcabE50 and gmorider like this.
  14. RailMix

    RailMix TrainBoard Member

    1,532
    3,863
    60
    I'll agree with that. I haven't really seen much of European railroading in the past, but Italian railroads in the era you model make for a very rich landscape. Nice work.
     
  15. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    Thank you guys!
     
  16. traingeekboy

    traingeekboy TrainBoard Member

    5,677
    580
    82
    The articulated electrics are my all time favorite of the Italian locos. I was never really crazy about 80-90's colors, mine is brown.
     
  17. strummer

    strummer TrainBoard Member

    253
    123
    18
    I think this a beautiful example of some fine craftsmanship.

    Thanks for sharing it with the rest of us.

    Mark in Oregon
     
  18. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    Thank you guys again, will stop posting for a while cause next step is what I hate most..... WIRING! :sick:
    I have to wire all LED lamplights and prepare the connections to the third module.
     
    traingeekboy likes this.
  19. traingeekboy

    traingeekboy TrainBoard Member

    5,677
    580
    82
    Devi fare i lavori poco a poco. (little by little) ;)
     
  20. minesweeper

    minesweeper TrainBoard Member

    637
    1,286
    37
    Spot on Geek, but i will go back to italy next summer and want to be done with module 3 before that, since now i can work in the attic, then it would be the garage.
     

Share This Page