Newcomer-Layout

Steffen B Jan 14, 2016

  1. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18

    Attached Files:

    Kurt Moose likes this.
  2. Michael Doleman

    Michael Doleman TrainBoard Member

    41
    6
    3
    I see that this thread has been up for a while, but am glad to have found it -- it has served to clear-up a mystery about something that was defying my capacity for understanding. I had not realized that for power-routed turn-outs, the power only gets cut to one of the two rails. Now that I know this it makes complete sense, and I totally get the *unexpected* results that I was seeing with some of my test layouts. For most of the situations I was setting-up, everything worked as I expected it to, and no problems. But for others, I was seeing things work in ways that made me think `huh... that doesn't seem as-advertised...' And now, thinking back on it, I know that what I've been seeing is this phenomenon of opposite-connecting rails meeting and completing a circuit. Good to know!

    And nice set-up, BTW -- it's actually a bit similar to what I've got planned for my first permanent layout.
     
  3. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    Hi all,

    here are some pics of the current status of work, made while being part of the annual train show in Emleben /Thuringia.

    Side of grain elevator and interchange track:
    Emleben 2018_02.jpg

    Depot, freight house and team track:
    Emleben 2018_03.jpg

    New bridge and stock yard:
    Emleben 2018_04.jpg

    Water tower and controls:
    Emleben 2018_06.jpg

    Beauties at the station....
    Emleben 2018_07.jpg
     
    Last edited: Nov 25, 2018
  4. eXact Modellbau

    eXact Modellbau TrainBoard Member

    159
    242
    22
    The track laying looks very realistic. Of course the landscape too.(y)
     
  5. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    Hallo Ronald,

    dankeschön :) and great work on your website!

    Hi all,
    I began work on creek side cutting the embankments out of foam. Because the creek is bending there will be two types of embankment: steeper on outside bend, gentle slope on inside bend. Should look something like this:

    Bachvorlage.JPG Stand 2018-12-06_01.jpg Stand 2018-12-06_04.jpg Stand 2018-12-06_06.jpg

    Before this I let grow weeds around the siding for "eastbound" trains unlike the main tracks to the left and right side.

    Stand 2018-12-06_02.jpg
     
    Last edited: Dec 7, 2018
  6. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    Hi all,

    got to make some progress on my little "water project".
    After cutting foam I applied plaster to embankmants and glued a layer of fine sand:
    Stand 2018-12-09.jpg Stand 2018-12-09_02.jpg

    Then I added some stones and water plants, thighted the creek ends by dough and poured woodland scenic water. All seemed to be ok:
    Stand 2019-01-27.jpg
    Stand 2019-01-27_02.jpg

    But then I realized sections in the creek which showed a kind of milky water, not only near the ends but in other areas. I replaced the whole creek bed only to see the same result:
    Stand 2019-01-29.jpg
    Stand 2019-01-29_02.jpg

    To find out what happened I made some tests now. They revealed a chemical reaction of the Woodland scenic water with the white glue I used for the creek bed. After some research (and removing the creek bed again...) I decided to attempt a method for water modelling used by a Swedish fellow "Marklinofsweden" using simply toilet paper, white glue, acrylic paints and water based clear varnish, complete non-toxic:

    Stand 2019-04-03.jpg

    Stand 2019-04-04.jpg

    Stand 2019-04-07.jpg

    Finally I could put in the creek bridge. To the moment I am working on detailing the embankments, then add bushes and trees:
    Stand 2019-05-07_04.jpg
     
    HemiAdda2d, Kez, bostonjim and 3 others like this.
  7. bostonjim

    bostonjim TrainBoard Member

    846
    1,105
    27
    Looks very nice. Thanks for all the progress pix. I will be referring to them, for sure. When I get a bit more time I will read the entire thread. Two thumbs up!!! Jim.
     
  8. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    Hi all,

    for the "US-Convention" in Rodgau, Germany next weekend I wanted to make some substantial progress in scenery.
    I finished the creek area, planted trees (modified Heki and Woodland scenic) and still more bushes.
    Then I added the beloved telegraph poles. These poles are Atlas N-scale (thanks JoeS). I removed the top bar and shortened the poles a bit.
    Looks like I can think about buildings now.

    20191009_164135.jpg
    20191009_124132.jpg

    20191009_184051.jpg

    20191009_184121.jpg

    20191009_234559.jpg
    20191009_234727.jpg
    20191009_235120_001.jpg
     
  9. Kurt Moose

    Kurt Moose TrainBoard Member

    9,851
    14,304
    147
    It's amazing how some of the little details really bring the scene alive!

    Great work!!(y)
     
    Rip Track likes this.
  10. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    Last monday I tried my first laser kit, a stock yard.
    At first I painted parts with black pencil and then with mixed powder colours for some weathering.
    It was an suprisingly easy task to assemble the kit, now ready for some cattles and a cowboy...

    Stand 2019-11-19_1.jpg
    Stand 2019-11-19_2.jpg
    Stand 2019-11-19_7.jpg
     
    Last edited: Nov 21, 2019
  11. Kurt Moose

    Kurt Moose TrainBoard Member

    9,851
    14,304
    147
    Wow!!
    That looks great!!(y)
     
  12. rray

    rray Staff Member

    8,305
    9,417
    133
    You did a good job on the stockyard kit. I really like that kit.
     
    z.scale.hobo likes this.
  13. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,049
    27,639
    253
    Fantastic work! I never would have guessed that was a toilet paper base to the creek.

     
  14. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    Hi, thank you all for your kindly words.

    While looking at the last picture I wonder, how cattles arrived at such a small stock yard in the fifties.
    Was it still done by horse, dog and cowboy or already by truck?
    So do I have to add an unloading ramp?
     
    Kurt Moose likes this.
  15. Steffen B

    Steffen B TrainBoard Member

    200
    667
    18
    I decided to add a small ramp for unloading from pick-up.
    Some cattles are waiting now for shipment with the next local freight.

    20191203_204902.jpg

    I plan to use the empty space in front of the stock yard to add a truck ramp for loading of stones, gravel and pulpwood into gondolas.
    Something like this:

    Vorlage loading pulpwood2.JPG

    So I made some measurements and a mock-up:
    20191203_205029.jpg
     
  16. bostonjim

    bostonjim TrainBoard Member

    846
    1,105
    27
    Nice prototype photo. I don't think I've seen a loading dock with ramps at both ends. That is some serious humping going on in the pic. They did all the loading/unloading by hand. We've come a long way from hard work. . It's going to look great in that space. Nice point of interest. Jim
     
    Steffen B, Joe Lovett and Kurt Moose like this.
  17. rray

    rray Staff Member

    8,305
    9,417
    133
    Awesome! [​IMG][​IMG][​IMG][​IMG][​IMG][​IMG][​IMG][​IMG][​IMG][​IMG][​IMG][​IMG] Just Awesome!
     
    Steffen B and Kurt Moose like this.
  18. Kurt Moose

    Kurt Moose TrainBoard Member

    9,851
    14,304
    147
    Keepin' warm up there in that Minnesota winter loading those logs into that NP gon, oh yeah!!:confused::eek:
     
  19. Commodore

    Commodore TrainBoard Member

    138
    115
    12
    Great job!
    ...Where is that stock yard kit in stock?
     
    Steffen B likes this.
  20. Joe Lovett

    Joe Lovett TrainBoard Member

    1,608
    4,575
    62
    Jim, really like the stock yard, is it a kit or scratch build? I have one planed on my Boston Mountains Sub Division layout for module 06. It will be interchangeable with an oil refinery to add interest and variety during operations.

    Thank you for posting.

    Joe
     

Share This Page