Rebuilding the Brazos River Bridge

r_i_straw Jun 8, 2016

  1. Chasbro

    Chasbro TrainBoard Member

    12
    13
    3
    Thank you for the kind words. It sure is nice to see and hear the trains running again.
     
  2. ddechamp71

    ddechamp71 TrainBoard Member

    2,153
    653
    46
    BTW, what's the rolling stock behind the 2 UP units ? Never seen that before. Looks like scrap loaded gondolas, but articulated such as 5-unit well cars....

    Dom
     
  3. r_i_straw

    r_i_straw Mostly N Scale Staff Member

    22,210
    49,628
    253
    Those are full of rip rap, or large rocks for a better term. They were using them to stabilize the river bank in front of the trestle bents.
     
    ddechamp71 likes this.
  4. ddechamp71

    ddechamp71 TrainBoard Member

    2,153
    653
    46
    Thank you. But I wasn't aware of this kind of articulated gondola until today.

    Dom
     
  5. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,560
    22,734
    653
    I am curious of the dumping mechanisms for those cars. Appearance is quite different from such as the Difco style we have seen.
     
  6. Chasbro

    Chasbro TrainBoard Member

    12
    13
    3
    I noticed the funny cars too. Five combinations, about 11 "cars" to a combination. Like a single car eleven cars in length. It made for much quicker and easier unloading as the scooping machine didn't have to wrestle with the front and rear walls as much. I'm not sure how it articulates though.
     
  7. Kurt Moose

    Kurt Moose TrainBoard Member

    9,813
    14,199
    147
    Maybe both sides open, releasing the rip rap to both sides of the tracks? I've seen a video of an old Milwaukee Road train of rip rap on flatcars, and a very skilled operator on an old bulldozer was literally pushing it off the sides onto the roadbed!!
     
    BoxcabE50 likes this.
  8. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,560
    22,734
    653
    That video seems vaguely familiar. Know I have seen something similar or the same one.
     
  9. Chasbro

    Chasbro TrainBoard Member

    12
    13
    3

    Here's some extreme close up footage of the bridge from the Fort Bend County of Emergency Management.
     
    BoxcabE50 and r_i_straw like this.
  10. r_i_straw

    r_i_straw Mostly N Scale Staff Member

    22,210
    49,628
    253
    A few good shots of them unloading rip rap with a "Back hoe" type excavator riding on the cars.
     
  11. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,560
    22,734
    653
    Looks to be a very time consuming operation. How long did it take to unload all those cars?
     
  12. Chasbro

    Chasbro TrainBoard Member

    12
    13
    3
    When I went back around noon the train was gone, so not too long. Or they didn't use it all.
     
  13. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,560
    22,734
    653
    I would wonder the latter- It was not all used.
     
  14. Chasbro

    Chasbro TrainBoard Member

    12
    13
    3
    Sorry to wake up this thread again but the river has risen to 40 feet and now workers are experiencing a rather large log jam. The new trestles they built are especially non aerodynamic to the water and catch a lot of debris. They've been picking at the back side with a couple of work boats. I'll try and get another look at it today.
     
    BoxcabE50 likes this.
  15. Kurt Moose

    Kurt Moose TrainBoard Member

    9,813
    14,199
    147
    Uh, oh. That's not good.......
     
  16. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,560
    22,734
    653
    Not a problem. Any open thread can be brought forward again, at any time.

    This is an excellent topic, so following it further continues to hold my interest! Pictures, please! (y)
     
    Kurt Moose likes this.
  17. r_i_straw

    r_i_straw Mostly N Scale Staff Member

    22,210
    49,628
    253
    Well, OK. After risking life and limp I managed to crawl out of the tangle of new growth vegetation along the river bank to the north west of the bridge and report back. o_O
    After all the rain, I thought I was prepared. Had my boots on and grubby cloths. The rain let up so there was a bit of wading across a flooded field to get to my old haunts of a few years ago where I documented the rebuilding of the piers. I wish I had brought a chain saw... or at least a machete. Since the flood a few years ago knocked down a lot of the brush and trees along the bank, it has all grown back with a vengeance.
    DSC_0002.jpg

    I finally was able to bush-whack my way down near the base of one of the piers along the bank to get a better view. I had to knock down some brush to get this one.
    DSC_0006.jpg
    The boats were attaching cables from the back hoe on the bank to the big logs and pulling them out of the jam. Then going back and grabbing another log.
    DSC_0004.jpeg
     
    Kurt Moose and BoxcabE50 like this.
  18. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,560
    22,734
    653
    They may need to drive some fender piles.
     
  19. Hytec

    Hytec TrainBoard Member

    13,965
    6,903
    183
    I've seen many bridges in this environment that have V-shaped structures on the upstream side of the piers. They serve quite well diverting debris, including whole trees, around piers.
     
    Kurt Moose likes this.
  20. r_i_straw

    r_i_straw Mostly N Scale Staff Member

    22,210
    49,628
    253
    Yeah, they need to put something around that pier. It is made up of 12 steel pilings grouped into 4 three unit clusters with all kinds of angled cross members to hold it all together. Like a giant log net just begging to snag everything going by.

    [​IMG]
     
    Kurt Moose likes this.