Registered: February 2005 Location: Big Bear Lake, CA Posts: 1,858
A better look at the difficulties ahead. How am I going to install the sub-roadbed for the main line? And then it hits me...wait till you see what I do next.
It will involve a shorter and tighter curve but still within the standards and perimeters I've set for the layout.
Did you notice the Atlas sliders? These are destined to be removed and a new map or straight line control panel utilizing DPDT toggled electrical switches will take their place. I may use the sliders, temporarily for the roundhouse tracks.
· Date: Mon October 20 · Views: 38 · Filesize: 53.8kb · Dimensions: 640 x 480 ·