TrainBoard.com  


RailImages.com



Notices

  Home · Search · Register  

Home » Member » BarstowRick » The Final Phase, Remodel & Construction. Previous image

1e-Staging_Yard
Construction

Photo Details
BarstowRick



TrainBoard/RailImages Supporter

Registered: February 2005
Location: Big Bear Lake, CA
Posts: 1,858
users gallery
After hours of planning, measuring, drawing up plans the layout is FINALLY taking shape.

Here on the lower deck, you can see the installation of the hidden staging yard behind the double tracked main. Those Kato #6 switches are amazing to install. In less then three hours I have the switches in place on both ends and track installed to the point of the connector. Now to bridge the gap.
· Date: Mon October 20 · Views: 34 · Filesize: 62.2kb · Dimensions: 640 x 480 ·
Additional Info
Keywords: Rick\'s Persistence
Print View
Linked Thumbnail:



Photo Sharing Gallery by PhotoPost
Copyright © 2007 All Enthusiast, Inc.






All times are GMT. The time now is 03:26 AM.


Powered by vBulletin® Version 3.8.0 Beta 2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Copyright TrainBoard.com, RailImages.com 2000-2009