Registered: April 2004 Location: Dewitt, MI Posts: 478
The tracks near left are part of the REA operation. Thel ong track that zigs around them is also for REA. There are 8 terminal tracks, one being a throughfare track. The raised mainline in the back has since been lowered.
· Date: Thu October 18 · Views: 159 · Filesize: 89.1kb · Dimensions: 640 x 480 ·