Ok, working on the layout right now. Should have progress update up tomorrow.
I would say Cary would be a good location, a town outside the city with alot of small businesses and Ready Creek Concrete. The CSX Aberdeen Sub...
Also panning on having a tourist railroad operating on the line. Using same benchwork from my attempt at the Sunset Route, the grades are 4%. A...
Track Plan: [IMG]
I have been off the forum for a while but I'm at it again... Layout at a Glance Name: CSX Georges Creek Subdivision Scale: N (1:160) Gauge:...
Change of Plans Something about CSX just has me coming back... After looking at Bruce's CSX Shenandoah Division I couldn't resist. Welcome to...
Had problems uploading but here it is, Norfolk Southern Raleigh District http://www.youtube.com/watch?v=BMZbclrmFyM
Can I have Music in the video?
Soo Line [IMG] NS train 350 at Cary, NC 10/23/10
Amtrak 92 in the Snow [IMG] Amtrak 92 at Apex, NC in the Snow 2/13/10
Big Blue [IMG] NS 63N at Cary, NC 9/25/10
Layout Progress as of 12/27/10 Got some work on the layout done over the Christmas break. Decided to just build the layout on the base boards and...
Over thanksgiving weekend I set up the base for the benchwork. All though some details need to be worked out the base of the benchwork pretty much...
[IMG] I finally received my Kato Unitrack V11 set over the past week. With this in I plan to start construction on the layout. For the first...
Well, I am going to start construction on the layout over the weekend! Going to put in the plywood boards and hopefully start putting in some...
The scene looks very sharp. I like how you always make sure the scenery objects aren’t to big that they crowd out the train!
Got the Kato Uni-Track V11 Super Elevated Double Track set finally! Construction should start before the end of the month. I'm thinking of...