N scale D&RGW Secret Places Sub layout progress

HemiAdda2d Oct 23, 2004

  1. Cleggie

    Cleggie TrainBoard Member

    525
    77
    18
    Good progess Hemi, just love the scenes you are modelling. It looks like a real challenge to capture the "feel" area. I am liking what I see so far and can feel my own inspiration building up as I need to get the plaster work done on my upper level.

    GO HEMI!!!
     
  2. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    Thanks, Ken!
    Your progress during the layout party was quite inspirational as well.
    Today, I built Tunnel 5, and added Flatirons to Tunnel 6/7. I hope I can carve them to look like real Flatirons!
    Mickey Mouse Wall will go on the backside of Tunnel 7's Flatirons, and is a prominent feature visible for miles. Of course, mine will be much more scaled-down.

    [​IMG]

    [​IMG]

    [​IMG]
     
  3. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    Mickey Mouse Wall, a popular local rock climbing spot, is the prominent Flatiron finger in the right of this photo at Tunnel 5:

    [​IMG]

    Another view, from Rainbow Cut, looking on as a WB coal empty charges thru Tunnel 3, and into Tunnel 4:

    [​IMG]
     
  4. TonyHammes

    TonyHammes TrainBoard Member

    1,359
    213
    34
    Jeremiah

    Looking good. I like the quick progress you can make working with the foam. Nothing like a Woodland Scenic Hot wire cutter to speed the process up.
     
  5. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    That little cutter is worth its weight in gold, IMHO. It sure makes the job cleaner, too!
     
  6. MOPMAN

    MOPMAN TrainBoard Member

    1,429
    1
    23
    I'm especially looking forward to seeing those completed flatirons. It's looking really good.
     
  7. dakotacowgirl

    dakotacowgirl TrainBoard Member

    44
    0
    10
    come one Hemi! Show them the mess you made first!!! I swear, I've never seen so much foam all over the house. :)
     
  8. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    OK, OK, I shot those last couple AFTER 30 minutes' worth of Shop-Vac.... It looked like a foam board exploded in there. But most of those scraps were useful again!:)
     
  9. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,722
    23,370
    653
    :tb-biggrin::tb-biggrin::tb-wink:

    Boxcab E50
     
  10. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    It's been a while, and with 10-12 hr days still continuing, and some saturdays as well, the job is busy as ever.
    I did manage to rebuild Tunnel 10 (which also doubles as Tunnel 15), and created the west portal area of T15. Scenic landforming in South Draw is progressing toward Tunnel 16 as well.
    Pics soon...
     
  11. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    [​IMG]

    Oh yeah, my new Vert-a-pac cars and the ATSF Bicentennial unit also came yesterday! Huzzah!
     
  12. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    A similar view is seen here:

    [​IMG]

    [​IMG]

    Another view, from Amtrak #5:

    [​IMG]
     
  13. friscobob

    friscobob Staff Member

    10,534
    718
    129
    That should look sweet once the scenery is in place. And that Santa Fe unit looks pretty sharp as well.
     
  14. Stourbridge Lion

    Stourbridge Lion TrainBoard Supporter

    16,680
    134
    184
    To give folks a different view of what HEMI is modeling I recently video taped Amtrak #5 passing through the Tunnel District and hope to have a simular video of Train#6 going the other direction.

    [ame="http://www.youtube.com/watch?v=AetppJVAb1Y"]YouTube - Amtrak #5 - Part 02[/ame]​
     
  15. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    :thumbs_up::thumbs_up:*DROOL* *DROOOOOOL*
    Thanks for posting, Darren! I like the abbreviated tunnels, too. No 30 seconds of black screen!:mtongue:
     
  16. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    I have been busy roughing-in South Draw.... It's slow-going, but little, by little, I am building a valley bowl. Once South Draw's valley is framed, I'll build scenery fromt he bottom up, and then build the Tunnel 16 area, Old Tunnel 17, and up to east portal of T17. I can't really buiild this much until I have the removable scenery (for access) in South Draw, so the terrain countours match.
     
  17. train1

    train1 TrainBoard Supporter

    560
    158
    25
    Awesome footage - that train really hugs the rocks around some of those turns. Great scenery - no wonder Hemi loves the area so much.
     
  18. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    Loads of cutting, and trimming and fitting to go yet. It is removable, so I can clean track, access a derailment, and take photos.

    [​IMG]

    Make no mistake, I made a mess when I built this area! :p

    [​IMG]
     
  19. Kurt Moose

    Kurt Moose TrainBoard Member

    9,892
    14,449
    147
    Why do I have a sudden craving for "bubble-gum" ice cream?:rolleyes: Keep up the good work, were all rootin' for ya'!:teeth:
     
  20. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,100
    28,026
    253
    Heheheee... Ice cream sounds delicious now...

    South Draw is roughed-in now, but work schedules and other things prevent working on it during the week. Tomorrow is a club meeting, and we're working on the Pete Ellis estate layout. Gotta get it running by the State Fair!
     

Share This Page