Chris333

Finished trackwork

Everything is soldered up and ready to peel away from the paper printout for cleaning. That's 16 turnouts, one of them a 3-way all built as one big piece. The rest of the yard stub tracks will be ME code 55 flex.

Finished trackwork
Chris333, Apr 18, 2007
Uncle peanut butter likes this.