Scott Stutzman

8 8 2010 Second deck going in. Wicopee siding will be on the first level here with Fraiser on the loop back above it.

8 8 2010   Second deck going in.    Wicopee siding will be on the first level here with Fraiser on the loop back above it.
Scott Stutzman, Aug 9, 2010