Virginian Railway

4 Dash9s wait for the conductor to throw the switch and begin the 3 step protection and head the Knoxville.

4 Dash9s wait for the conductor to throw the switch and begin the 3 step protection and head the Knoxville.
Virginian Railway, May 23, 2012