View RSS Feed

Recent Blogs Posts

  1. Track Laying Update

    So now that the G-Scale storage shelves are now up and mounted to the wall (With pass through for HO Scale Trians) The track that is being laid to run around the room, is now starting. With my original switch set up I've combined two tracks to run as one through the first shelf tunnel and now I just laid a reverse switch to run one track through the second while it runs back to the wall. This means that at any point along the shelf, there is 3 tracks running. It's hard to explain without photos. ...
    Categories
    HO Scale