Flash Blackman
January 28th, 2008, 12:12 PM
Construction pictures of the Central Carolina South Bound by Kevin Beck. (http://www.trainboard.com/grapevine/showthread.php?t=94029) This is a large N scale layout. The pictures include both construction of the layout building and of the layout itself. Wonderful pictures, wonderful layout, wonderful thread for a lot of inspiration! :thumbs_up:
Early construction, around July, 2007.
http://pictures.khbeck.com/ccsb20/dscf8098.jpg
More recent benchwork construction, December, 2007.
http://pictures.khbeck.com/ccsb20/dscf0063.jpg
Excellent thread on layout construction.
Early construction, around July, 2007.
http://pictures.khbeck.com/ccsb20/dscf8098.jpg
More recent benchwork construction, December, 2007.
http://pictures.khbeck.com/ccsb20/dscf0063.jpg
Excellent thread on layout construction.