skipgear
February 10th, 2006, 08:05 AM
I'm trying to find some specs and or info about a bridge.
http://www.railimages.com/albums/tonyhines/adc.sized.jpg
http://www.railimages.com/albums/tonyhines/add.sized.jpg
The truss bridge in use by CSX (Actually leased to IORR now). I would like to find the span of the bridge and any other relevant information.
The bridge was a double track bridge with one line using a truss and the other a plate girder bridge in the 50's I believe. The truss span was taken down sometime in the late 80's if I remember correctly. The bridge is in the heart of Loveland, OH where the line crosses the Little Miami river. Shortly after crossing the river, the line also crossed a PRR double track line, at least in the time I am modeling. There was a point in time earlier where the bridge consisted of 2 truss bridges side by side also. I'm not really sure of the time frame when it was in each form though.
Any info would be greatly appreciated. I am modeling in N scale and have a set of 3 Kato truss bridges as my starting point for the truss spans. I am going to have to scratch build the plate bridges. If I am going that far, I would like to try and build everything to the correct length.
[ February 10, 2006, 02:11 AM: Message edited by: skipgear ]
http://www.railimages.com/albums/tonyhines/adc.sized.jpg
http://www.railimages.com/albums/tonyhines/add.sized.jpg
The truss bridge in use by CSX (Actually leased to IORR now). I would like to find the span of the bridge and any other relevant information.
The bridge was a double track bridge with one line using a truss and the other a plate girder bridge in the 50's I believe. The truss span was taken down sometime in the late 80's if I remember correctly. The bridge is in the heart of Loveland, OH where the line crosses the Little Miami river. Shortly after crossing the river, the line also crossed a PRR double track line, at least in the time I am modeling. There was a point in time earlier where the bridge consisted of 2 truss bridges side by side also. I'm not really sure of the time frame when it was in each form though.
Any info would be greatly appreciated. I am modeling in N scale and have a set of 3 Kato truss bridges as my starting point for the truss spans. I am going to have to scratch build the plate bridges. If I am going that far, I would like to try and build everything to the correct length.
[ February 10, 2006, 02:11 AM: Message edited by: skipgear ]